OneTaskList logoOneTaskList

Connect Altus

Professional

What becomes a task

Altus project tasks assigned to you.

Connect it

  1. Choose Add connection in the sidebar, find Altus, and choose Connect.
  2. Next to Connected account, choose Connect and sign in.
  3. Set the options below and an age limit, then choose Save.

For Altus:

  • After signing in, choose the Dynamics 365 environment that hosts your Altus workspace.

More detail in Connect a tool.

Settings

Filter Tasks By Project
The projects to load. Choosing one project also lets you pick buckets.
Assigned To Me
Only tasks assigned to you are loaded. This can’t be changed yet.
Buckets To Load
With one project, the buckets to load. If none, buckets that aren’t 100% complete are loaded.
Done Bucket
With one project, where finished tasks go. If none, tasks are set to 100% complete.
Default Bucket
Where tasks show on the Altus project board by default.

When you finish a task

The task moves to your Done Bucket, or its progress is set to 100%.

Good to know

  • Altus Lists connects the same way as Dynamics 365.
  • To switch environment, use Change account.
Something not working? Fix a connection